home *** CD-ROM | disk | FTP | other *** search
/ Hráč 2004 July / Hrac_71_2004-07_dvd.iso / dema / Americas Army 2_1 / armyops210.exe / BRIEFI~1.cab / bridge_se.txt < prev    next >
Text File  |  2004-05-20  |  2KB  |  51 lines

  1. ASSAULT
  2.  
  3. Situation: Enemy forces masquerading as refugees have 
  4. ambushed the US forces defending bridge at grid WS663429. 
  5. Your force returning from patrol is now on the hostile 
  6. side of bridge, and must link up with your company 
  7. headquarters to pass along time-sensitive information.
  8.  
  9. Mission: Squad will meet with company transport at grid 
  10. WS763529, on the far side (East side) of the bridge. The 
  11. information you possess must be passed to the Company 
  12. HQ NLT 241730LNOV03.
  13.  
  14. Enemy: Enemy consists of a squad-sized force occupying 
  15. the bridge.  The enemy force is armed with assault 
  16. rifles, grenades, and an advanced marksmanship team.
  17.  
  18. Troops: One infantry squad with advanced marksmanship 
  19. team.
  20.  
  21. Terrain: High-altitude stone bridge spanning a mountain 
  22. chasm.  Adverse weather conditions (high winds and fog) 
  23. prevent air support.  The three bridge towers constitute 
  24. key terrain.  
  25.  
  26.  
  27. DEFENSE
  28.  
  29. Situation: Ongoing contingency operations have your 
  30. platoon controlling a stone bridge at grid WS663429.  
  31. This bridge is vital to UNHCR operations.  Enemy forces 
  32. masquerading as refugees have attacked your platoon.  
  33. Your platoon leader has charged your squad with delaying 
  34. the enemy force until friendly reaction forces arrive.
  35.  
  36. Mission: Squad delays enemy forces from crossing bridge 
  37. at grid WS663429 until reaction force arrives.
  38.  
  39. Enemy: Enemy consists of a fanatic squad-sized force 
  40. armed with assault rifles, grenades, and an advanced 
  41. marksmanship team.
  42.  
  43. Troops: One infantry squad with advanced marksmanship 
  44. team.
  45.  
  46. Terrain: High-altitude stone bridge spanning a mountain 
  47. chasm.  Adverse weather conditions (high winds and fog) 
  48. prevent air support.  The three bridge towers constitute 
  49. key terrain.  
  50.  
  51.